Marine operation caps HPC cooling water tunnels [–with video]
The barge cranes Rambis and Gulliver take the weight of the final head structure The final 5,000-tonne concrete structure was towed 30 nautical miles into the Bristol Channel to meet two floating heavylift cranes Gulliver and Rambiz – which have a combined lifting capacity of 7,300 tonnes. The two cranes then worked in tandem to …
Marine operation caps HPC cooling water tunnels [–with video] Read More »
![Marine operation caps HPC cooling water tunnels [–with video]](https://topbrandsreviewed.com/wp-content/uploads/2022/08/22749-marine-operation-caps-hpc-cooling-water-tunnels-with-video-1024x579.jpg)








